Hi all,
The RO water loop will be sanitized next Monday the 28th of October. This is a two day process and RO will be unavailable on both the 28th and 29th, as the system needs to be flushed repeatedly before usage.
The techs will be going lab to lab after the sanitization to assure chlorine levels are reduced to undetectable to finish the job. During the sanitization, water to both millipore systems on the 4th floor and the picopure system needs to be turned off to avoid burning out the cartridges. Also any fish tanks which may still be connected to the loop must be turned off.
Thank you all for your attention.