All,
The campus will begin their annual high temperature hot water outage beginning this Friday, May 22nd. Both laboratory and domesstic hot water will be affected along with both humidity levels in the vivarium and most of our autoclaves. Humidity in the vivarium will be maintained by humidifiers, if required.
The third floor autoclave on the right hand side will be operational for the duration of the outage which is scheduled to end on June 6th. This annual outage is critical for the maintenance of the steam used to heat the bulk of the campus.
Thank you for your understanding.