The contractor working on the Interdisciplinary Life Sciences Building will begin installing new sidewalk pavers near the south entrance of the Commons Building beginning approximately Wednesday 9/19/2018. The installation will require the temporary relocation of the exterior walkway in this area and partial closures to the Commons Building entry doors. The rotation of door closures will continue through approximately Friday 10/5/2018 with minor shifts to the exterior walkway continuing through mid-October.
An accessible route will be maintained into the Commons Building and through the area during most of this time. During times that an accessible route to the ground floor entrance is not available, signage will direct pedestrians to an alternate accessible route. Entrances to the first floor and upper levels of The Commons will be unaffected by the project.