1.
Emergency construction outside Sondheim/Math-Psych/Sherman will
continue and hopefully end this week. People will be able to get
through on Academic Row, but the South accessible entrance to our
building will remain unavailable. Signage is placed and they have a
flagger on site to help people find their way. The North assisted door
on the first floor remains available. Other accessible entrances to the Math/Psych building include:
- Via the Ground floor connection tunnel between Math-Psych and Sondheim - Sondheim has two new elevators and the assisted door that leads to the Quad and ILSB has been repaired.
- Via the fourth floor skywalk entrances on both sides of the building from the fourth floor of either Biology (2-3 elevators) or Sondheim (2 elevators)
2. The
Biology building has one older elevator waiting on a part - the elevator
right next to it is operational, and the third, new Access Maryland
project elevator on the other side of the breezeway (the Schwartz Hall
section) serves all floors of the Biology building as well.
3.
The RAC Replacement Elevator is almost complete. It will be inspected
during the second week of class - the front desk staff will assist
anyone needing access to the lower (court) levels.