All, The project in the entry ways of the building has finished early, except for some additional caulking in the Physics facing entrance. That work will not affect access tot he building. Thank...
All, The work at the east side entrance of the building has gone quicker than anticipated. That portion of the work will be completed around noon today. Once that work is inspected and approved,...
Facilities Management will begin work on Tuesday, May 26, 2026 to replace the two ILSB entrance vestibule ceilings. The work is needed to provide proper access to HVAC equipment located in the...
All, Autoclave waste must be put into a black bag prior to being put into the autoclave trash cans in the research wings for disposal. Three autoclaved red bags made their way to the loading...
Hi all, The high temperature hot water outage will begin tomorrow and last through June 8th. There will be no hot water in the restrooms and temperatures will most likely be chilly in the...
All, Within the last week a table used for microscopy in room 221E went missing. Whoever took it moved the microscope off of of the table and onto a cart, so it's obvious that the table was...
All, The campus will begin their annual high temperature hot water outage beginning this Friday, May 22nd. Both laboratory and domesstic hot water will be affected along with both humidity...
Hi all, Several projects are scheduled to begin immediatley after Memorial day. East (Physics) exit / entrance work at the ceiling 5.26.26 - 6.2.26 West (Quad) exit / entrance work at the...
All, Beginning May 26th, facilities will be conducting some work at the north entrance of the ILSB (Facing Physics) to address mechanical access panels in the ceiling. The plan currently will...
All, It's hard to believe, but finals begin in less than two weeks. I know students will become scarce and before you disappear for the summer, I need to know who I will need to remove from...