Please be advised that a High Temp Hot Water outage is currently in effect and is expected to continue through approximately June 7.
During this time:
Temperatures in the RAC may be affected.
Hot water will not be available in the locker rooms.
In addition, if the pool temperature drops below a safe operating level, the pool will need to close temporarily. Any closures or important updates will be communicated as needed.
Thank you for your patience and understanding.